GENERAL REGULATIONS |
§ 51.01. PREAMBLE. |
§ 51.02. CONFLICTING ORDINANCES. |
§ 51.03. COMPLIANCE WITH THIS CHAPTER AND OTHER ORDINANCES. |
§ 51.04. ABBREVIATIONS AND DEFINITIONS. |
§ 51.05. GENERAL STORMWATER CONTROL POLICY. |
§ 51.06. DETERMINATION OF IMPACT DRAINAGE AREAS. |
§ 51.07. INFORMATION REQUIREMENTS. |
§ 51.08. SUBMITTAL AND CONSIDERATION; ROLES OF CITY ENGINEER AND COUNCIL. |
§ 51.09. METHODOLOGY FOR DETERMINATION OF PRE AND POST-DEVELOPMENT |
§ 51.10. METHODOLOGY FOR DETERMINATION OF DETENTION STORAGE VOLUMES. |
§ 51.11. STORM SEWER DESIGN STANDARDS AND SPECIFICATIONS. |
§ 51.12. OPEN CHANNEL DESIGN STANDARDS AND MATERIALS. |
§ 51.13. STORMWATER DETENTION DESIGN STANDARDS. |
§ 51.14. MISCELLANEOUS DESIGN CRITERIA. |
§ 51.15. EASEMENT REQUIREMENTS. |
SPECIFIC REGULATIONS |
§ 51.30. EROSION AND SEDIMENT CONTROL. |
§ 51.31. PLACEMENT OF UTILITIES. |
§ 51.32. COMPLIANCE REQUIRED AND TIME LIMITS FOR PERMITS. |
§ 51.33. CHANGE IN PLANS. |
§ 51.34. CERTIFICATIONS REQUIRED FOR AS-BUILT CONDITION. |
§ 51.35. SUBDIVISION COVENANTS. |
§ 51.36. INSPECTIONS AND CORRECTIVE MEASURES. |
§ 51.37. DISCLAIMER OF LIABILITY. |
§ 51.38. EFFECTIVE DATE. |
§ 51.39. EXEMPT PROJECTS. |
§ 51.40. PERMIT FEES. |
§ 51.41. DETAILED DRAWINGS OF DESIGN STANDARDS AND APPENDIX |
§ 51.99. PENALTY. |