Brazil |
Code of Ordinances |
Title V. PUBLIC WORKS |
Chapter 51. DRAINAGE AND SEDIMENT CONTROL STANDARDS |
SPECIFIC REGULATIONS |
§ 51.30. EROSION AND SEDIMENT CONTROL. |
§ 51.31. PLACEMENT OF UTILITIES. |
§ 51.32. COMPLIANCE REQUIRED AND TIME LIMITS FOR PERMITS. |
§ 51.33. CHANGE IN PLANS. |
§ 51.34. CERTIFICATIONS REQUIRED FOR AS-BUILT CONDITION. |
§ 51.35. SUBDIVISION COVENANTS. |
§ 51.36. INSPECTIONS AND CORRECTIVE MEASURES. |
§ 51.37. DISCLAIMER OF LIABILITY. |
§ 51.38. EFFECTIVE DATE. |
§ 51.39. EXEMPT PROJECTS. |
§ 51.40. PERMIT FEES. |
§ 51.41. DETAILED DRAWINGS OF DESIGN STANDARDS AND APPENDIX |
§ 51.99. PENALTY. |